Copyright Goodheart-Willcox Co., Inc. May not be reproduced or posted to a publicly accessible website.
Unit 6 Combined Operations
49
Name _________________________________ Date _____________ Class _____________
8. Castings are fi nished on a belt grinder. Twenty-fi ve castings are fi nished per
hour, and the grinder belt lasts 18 hours. If a higher-grade belt will last 30 hours,
how many more castings can be fi nished on one grinder belt, using the
higher-grade belt?
________________________________________
9. If the lower-grade belt in problem 8 costs $7 and the higher grade belt costs $11,
which costs less per casting fi nished?
________________________________________
10. How many of the parts shown in the fi gure below can be made from a piece
of stock 850 millimeters long?
7 mm
4 mm
4 mm
40 mm 30 mm
Goodheart-Willcox Publisher
________________________________________
Previous Page Next Page