Copyright Goodheart-Willcox Co., Inc. 292 Section 4 Construction Details Once the panels are at the site, they can be lifted into position, Figure 14-32. Panels are erected to begin forming the structure of the building, Figure 14-33. Figure 14-34 shows a completed precast building. Brick Industry Association Figure 14-30. Installation of thin brick units over steel stud framing using the thick set method. Wallboard Steel stud Building felt Thin brick Bond coat Scratch coat Wire lath Wallboard Steel stud Thin brick Bond coat Scratch coat Wire lath Gage Brothers in Sioux Falls, SD Figure 14-31. Employees are working on a forming table for creating precast panels. Thin brick are being placed in rubber pattern mats that hold brick in place. Gage Brothers in Sioux Falls, SD Figure 14-32. A precast panel being unloaded and positioned using a construction crane. The windows are already built into this panel, which is one of the many panels used to create the exterior of the building. The construction worker has a lead rope to guide the panel into position. Note the safety gear worn by the worker.